|
Á¶¼±»ì
|
|
 |
DOkweiTvaJaq |
 |
389 |
|
 |
I'm afraid that number's ex-directory http://xnxx.in.net/xnxxhd/ Xnxx Hd
The El Sharara field operated through a joint-venture withRepsol has a capacity of around 350,000 bpd, and flowswere already starting to feed the 120,000 bpd Zawiya refinery,which has been running on alternative Brega oil from the east inrecent weeks due to the shutdown. |
 |
 |
Osvaldo |
 |
2019-05-28 03:53:54 |
|
|
|
|
|
|
|
|