Á¶¼±»ì
BfpNkdCTFmxnyLvq 394
I can't stand football http://freeones.in.net/ freeones videos  In its "10-year network development plan 2012", the EuropeanNetwork of Transmission System Operators for Electricity(ENTSOE) identified the need to invest 104 billion euros ($138billion) in 52,300 km of extra high voltage transmission at 100bottlenecks, the vast majority of which were related to theintegration of renewable power.
Rayford 2019-08-13 17:40:21

ȸ»ç¼Ò°³ | ã¾Æ¿À½Ã´Â ±æ | ÀÎÁõ³»¿ëº¸±â